Sign In | Join Free | My carsrow.com
China Hebei Pantu Machinery Equipment Co., Ltd logo
Hebei Pantu Machinery Equipment Co., Ltd
Pursue quality and ensure service.
Active Member

3 Years

Home > Choke Kill Manifold >

2 Inch Choke Kill Manifold Drilling Well Control For Oil Wells

Hebei Pantu Machinery Equipment Co., Ltd
Contact Now

2 Inch Choke Kill Manifold Drilling Well Control For Oil Wells

Brand Name : Hebei Pantu

Model Number : YG35

Certification : API 16C

Place of Origin : China

MOQ : 1 set

Price : USD 50000-100000 per set

Payment Terms : T/T

Supply Ability : 5 sets per 3 months

Delivery Time : 7 work days

Packaging Details : Iron Case

Name : Choke Manifold And Kill Manifold

Model : YG35

Bore size : 2 9/16"

Pressure : 5000psi

Application : Oil Wells

Standard : API

Contact Now

API Choke Manifold And Kill Manifold 2 9/16" 5000psi

Choke Manifold And Kill Manifold is the necessary equipment to control well kick and implement pressure control technology of oil and gas wells. When the BOP is closed, the choke valve is used to control the casing pressure to maintain the bottom hole pressure slightly greater than the formation pressure and to prevent further formation fluid flow into the well. In addition, choke manifold can be used to relieve pressure to achieve soft shut-in.

Choke Manifold And Kill Manifold Parameter

Type Working pressure Main bore dia By-pass dia. Remarks
(psi) On.) (In.)
YG140 20000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 1/16" 2 9/16" Different types of combinations can be provided according to requirements
YG105 15000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 9/16" 2 1/16"
YG70 10000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 4 1/16" 3 1/16" 2 9/16" 2 1/16"
YG35 5000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"
YG21 3000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"

Working Principles


When the pressure inside the well rises, opening/closing the choke valves(including manual chokes, hydraulic chokes, and positive chokes)on the choke manifold can allow the release of the fluid inside the well to control casing pressure, which can be directly blown out through the gate valve if the casing pressure is quite high.

Operating Instructions


(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the operator can reach it easily. The pressure test must be performed before installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120-degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low-temperature conditions.


Product Tags:

2 Inch Choke Kill Manifold

      

2 Inch Choke Manifold Drilling

      

Oil Wells Choke Kill Manifold

      
 2 Inch Choke Kill Manifold Drilling Well Control For Oil Wells Manufactures

2 Inch Choke Kill Manifold Drilling Well Control For Oil Wells Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hebei Pantu Machinery Equipment Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)